Question 969 Topic 4

Topic 4
The BEST key performance indicator (KPI) to measure the effectiveness of the security-patching process is the percentage
of patches installed:

  • A. successfully within the expected time frame.
  • B. successfully during the first attempt.
  • C. by the security administration team.
  • D. without causing an unplanned system outage.
Answer:

D