SAP Certified Specialist - SAP S/4HANA Conversion and SAP System Upgrade
Last exam update: Nov 18 ,2025
Page 1 out of 3. Viewing questions 1-15 out of 40
Question 1
You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answe rs to this question.
A.
Modification adjustment (SPAU)
B.
Modification adjustment (SPDD)
C.
Activation of dictionary objects (ACT_UPG)
D.
Conversion of application tables (PARCONV_UPG)
Answer:
B C
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 2
You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answe rs to this question.
A.
Software update
B.
Main import
C.
Migration
D.
Conversion
Answer:
C D
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 3
You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answe rs to this question.
A.
TABIM_UPG
B.
PARDIST_SHD
C.
PARMVNT_UPG
D.
TABIM_SHADOW_*
Answer:
B C
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 4
What is the main purpose of performing benchmark runs for an SAP S/4HANA conversion?
A.
To optimize the conversion
B.
To optimize the main import
C.
To optimize the migration
D.
To optimize the activation
Answer:
C
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 5
What do you need to know about the SAP S/4HANA Conversion Guide? Note: There are 2 correct answe rs to this question.
A.
It contains a section about the simplification item (SI) checks.
B.
It explains the database migration option (DMO) of SUM.
C.
It is a database-specific document.
D.
It explains where to find information about the custom code analysis.
Answer:
A D
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 6
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answe rs to this question.
A.
Uninstall industry extensions NOT supported by SAP S/4HANA.
B.
Delete client 066 (Early-Watch client).
C.
Uninstall Fiori apps NOT released for SAP_UI 7.50.
D.
Install add-on SAP Gateway 7.50.
Answer:
B C
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 7
What do you need to consider when performing the SI checks for an SAP S/4HANA conversion? Note: There are 2 correct answe rs to this question.
A.
You need to build up an SI check framework by applying SAP Notes.
B.
The errors from the SI checks must be solved; otherwise, SUM will report an error.
C.
You need an SAP system based on AS ABAP 7.50 or above for the SI check framework.
D.
The SI checks are executed in the development system and the results are transported into the subsequent systems.
Answer:
A B
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 8
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note: There are 2 correct answe rs to this question.
A.
Check the dump size of the database export on disk.
B.
Check the log files written in the SUM directory, subdirectory abap, subdirectory log.
C.
Check logs for jobs starting with RSUPG_SGEN in the SAP system.
D.
Check the Charts Control Center in the SUM UI.
Answer:
B D
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 9
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
A.
EU_CLONE_MIG_DT_RUN
B.
EU_CLONE_MIG_SOT_RUN
C.
EU_IMPORT_ALL
D.
EU_CLONE_MIG_DT_CREATE
Answer:
A
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 10
Which steps can SUM perform during an SAP S/4HANA conversion? Note: There are 2 correct answe rs to this question.
A.
Custom code analysis
B.
Software update
C.
Unicode conversion
D.
Database migration
Answer:
B D
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 11
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
A.
Perform the migration of data to the new data structure.
B.
Run the database migration to the SAP HANA database.
C.
Check the compatibility of custom code with SAP S/4HANA.
D.
Solve problems from the simplification item (SI) checks.
Answer:
C
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 12
You want to perform an SAP S/4HANA conversion using SUM with DMO. Which steps run before the beginning of the technical downtime, irrespective of your SUM configuration? Note: There are 3 correct answe rs to this question.
A.
Activation of dictionary objects in phase ACT_UPG
B.
Import of upgrade and language data from the download directory in phase TABIM_UPG
C.
Generation of the new ABAP loads in phase RUN_SGEN_GENER8
D.
Creation of application tables in the SAP HANA database in phase EU_CLONE_MIG_DT_CREATE
E.
Import of dictionary objects from the download directory in phase DDIC_UPG
Answer:
A D E
User Votes:
A
50%
B
50%
C
50%
D
50%
E
50%
Discussions
0/ 1000
Question 13
During a SUM run, you want to check if the PARCONV_UPG phase is still running properly. Where can you find information about this? Note: There are 2 correct answe rs to this question.
A.
Check the running batch job via Job Overview (SM37).
B.
Check for running R3trans processes on the host where SUM is running.
C.
Check for running R3load processes on the host where SUM is running.
D.
Check the latest log files in the SUM directory, subdirectory abap, subdirectory tmp.
Answer:
A D
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 14
During the upgrade of your development system, you run into the adjustment of non-dictionary objects, handled by transaction SPAU. There you find programs that are shown in status "automatic adjustment" (green traffic light). What will happen with these programs when you continue with your upgrade without performing any other actions inside your SAP system?
A.
SUM continues with the next phase and your modifications are kept as in the start release.
B.
SUM refuses to continue unless you have marked a transport request as modification adjustment transport.
C.
SUM continues with the next phase, and your modified objects are set to the new SAP standard.
D.
Before continuing with the next phase, SUM asks for a modification adjustment transport.
Answer:
A
User Votes:
A
50%
B
50%
C
50%
D
50%
Discussions
0/ 1000
Question 15
What is the name of the additional server that is used for a transition to SAP S/4HANA Cloud Private Edition?