Question 1

Which of the following business processes are controlled by parameters that are dependent on
production order type? Note: There are 2 correct answers to this question.

  • A. Inspection during production
  • B. Planning
  • C. Engineering change management
  • D. Implementation
Answer:

B, D

Discussions

Question 2

Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2
correct answers to this question.

  • A. Setup time
  • B. Total replenishment lead time
  • C. Float after production
  • D. Planned delivery time
Answer:

C, D

Discussions

Question 3

What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP creates capacity requirements without checking the capacity of a work center.
  • C. MRP creates capacity requirements only if the work center has sufficient capacity.
  • D. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
Answer:

B

Discussions

Question 4

For what production type are production orders used?

  • A. Period and quantity-oriented production
  • B. Replenishment controlled by control cycles
  • C. Process manufacturing processes
  • D. Discrete manufacturing processes
Answer:

D

Discussions

Question 5

How can you carry out cost object controlling for production orders? Note: There are 2 correct
answers to this question.

  • A. Order-related
  • B. Cost-related
  • C. Product-related
  • D. Milestone-related
Answer:

A, C

Discussions

Question 6

What determines whether the planned independent requirements in MRP consume other
requirements?

  • A. Requirements type
  • B. Order type
  • C. Requirements profile
  • D. Consumption sequence procedure
Answer:

A

Discussions

Question 7

Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.

  • A. Maximum stock level
  • B. Purchase orders
  • C. Safety stock
  • D. Lot size
Answer:

C, D

Discussions

Question 8

What are some uses for the low-level code assigned to each material? Note: There are 2 correct
answers to this question.

  • A. It is used in MRP to determine the sequence in which materials are planned.
  • B. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • C. It is used by product costing to determine how costs are rolled up.
  • D. It is used by ATP to determine the priority of alternative components.
Answer:

A, C

Discussions

Question 9

Your company produces a finished good based on a forecast and expects it to being stock when
customers order it. If customers order more than the forecasted quantity, the production quantity
should be increased to try to meet the extra demand. Which planning strategy do you use?

  • A. Make-to-stock production (10)
  • B. Planning without final assembly (50)
  • C. Make-to-order production (20)
  • D. Planning with final assembly (40)
Answer:

D

Discussions

Question 10

Where does the system check master data selection settings during the creation of planned orders
and production orders? Note: There are 3 correct answers to this question.

  • A. In the production version
  • B. In the production order type
  • C. In the routing
  • D. In the bill of materials (BOM)
  • E. In the MRP controller
Answer:

B, C, E