Huawei h12-425 practice test

HCIP-Data Center Facility Deployment V1.0 Exam


Question 1

If the customer load cannot be power-off, what should be taken care when closing the maintenance
bypass switch?

  • A. The maintenance bypass switch can also be closed in the inverter power supply mode
  • B. Turn off the inverter, let the UPS be in bypass power supply mode and then close the maintenance bypass switch
  • C. First perform EPO then close maintenance switch
  • D. Close the maintenance switch first and then execute the EP
Answer:

ABD

Discussions

Question 2

The reason for using the EPO status interface in the parallel step of the UPS5000-E is ().

  • A. Prevent electric shock and protect personal safety
  • B. Power off the load to prevent damage to the load device
  • C. Protect the battery from discharge
  • D. Cut off the output and set the parallel parameters
Answer:

D

Discussions

Question 3

In the process of disconnecting the battery pack switch, if there are multiple sets of batteries, first
disconnect the main switch between the battery pack and the UPS, and then disconnect the switch of
each battery pack

  • A. TRUE
  • B. FALSE
Answer:

A

Discussions

Question 4

The cycle life of the battery is direct proportional to the depth of discharge

  • A. TRUE
  • B. FALSE
Answer:

B

Discussions

Question 5

To balance the capacity loss caused by the self-discharge of the battery during the use of the battery,
it is necessary to charge the battery continuously and for a long time at constant voltage, which is
called ().

  • A. charging
  • B. self-discharge
  • C. balanced charging
  • D. charging test
Answer:

A

Discussions

Question 6

The report functions of NetEco has a variety of presentation forms, including visualization of bar
charts, pie charts, graphs, etc.

  • A. TRUE
  • B. FALSE
Answer:

A

Discussions

Question 7

When the temperature detector or smoke detector in the FusionModule1000 generates an alarm, ( )
emits a continuous beeping sound to remind you to take measures as soon as possible to avoid a
major accident.

  • A. Electricity or voltage ratio setting error
  • B. The corresponding voltage collection line is abnormal.
  • C. Corresponding current transformer failure
  • D. Intelligent power meter failure
Answer:

ABCD

Discussions

Question 8

Huawei NetCol5000-A line-level precision air conditioner mainly solves the hot issue of high-density
data center

  • A. TRUE
  • B. FALSE
Answer:

A

Discussions

Question 9

After installing a top air outlet component for the UPS5000, need to set enabled for the top air outlet
component on LCD

  • A. TRUE
  • B. FALSE
Answer:

A

Discussions

Question 10

First time powering on UPS5000-E, make sure that the UPS main input switch, bypass switch, output
switch, maintenance bypass switch and battery switch are all OFF

  • A. TRUE
  • B. FALSE
Answer:

A

Discussions
To page 2