[Material Requirements]
Which of the following is false per the requirements of API Standard 936?
A
[Installation Procedures]
The mock-up for vibration cast installations demonstrates the adequacy of the: (This may have more
than one correct answer; please select all that apply.)
B,C,D
[Terms, Definitions, and Abbreviations]
Materials that are easily reduced to a granular or powdery condition after placement are known as:
A
[Responsibilities and Qualifications]
Conflicts in documents and/or drawings shall be resolved by the:
B
[Terms, Definitions, and Abbreviations]
The vessel in which the cracking reaction occurs or is completed, and in which the product gases are
separated from coke and/or catalyst particulate, is the:
B
[Material Requirements]
Each sample tested in accordance with ASTM C181 for workability index shall consist of how many
specimens?
C
[Responsibilities and Qualifications]
Surface preparation and welding procedures are the responsibility of the:
B
[Terms, Definitions, and Abbreviations]
Which of the following is the term for aggregate and/or cement that bounces away from a surface
against which refractory is being projected by gunning?
C
[Installation Procedures]
Who is responsible to approve refractory dryout procedures that have more than one heat source?
B
[Installation Procedures]
During gunning, inclusion of rebound is minimized by which of the following techniques?
C
[Inspection and Testing Requirements]
Which of the following is the appropriate term for testing refractory that was sampled during project
site installation in order to confirm that it meets specified physical property standards?
C
[Material Requirements]
The quantity of manufactured refractory that has the same formulation as that prepared in an
uninterrupted manufacturing operation is called a:
C
[Inspection and Testing Requirements]
Which of the following is a quality control element?
(This may have more than one correct answer; please select all answers that apply.)
A,B,C
[Installation Procedures]
If the refractory lining is required before pressure testing, all pressure-retaining welds shall:
C
[Material Requirements]
When water is used for refractory installed on a carbon steel surface with a stainless steel anchorage,
the chloride content of the potable water shall not exceed:
A